Light plaster home with a timber-lined overhang, oak entry door, bronze-framed window and limestone approach beside an olive tree and three agaves.

The Part of Santa Monica's Future Airport Park That's Already Open

The line outside a restored 1940s airport administration building on Airport Avenue has run as long as 45 minutes this month. Eater LA reported that the people in it are waiting for croissants, sausage rolls, Danishes and baguettes from Matilda's Bakery. Matilda's opened in early October and mostly sells more than 3,000 pastries a week. On October 12 the shop posted an apology on Instagram and thanked customers who had waited in line during its first weeks. Nine days later, a steakhouse opened in the same building. It is named for a jet parked at the museum next door.

Also in October, Santa Monica released its draft plan for turning the 200-acre airport into a public park. The draft sets aside the strip along Airport Avenue for food, performance and cultural events. That part of the future park already exists, and Matilda's serves breakfast there five days a week.

One Operator, Three Restaurants

Restaurateur Sean Martin has been building on this street for six years. He opened The Cloverfield at 3300 Airport Ave. in August 2020, taking over the space of the long-running Spitfire Grill. The name comes from the airport's original name, Clover Field. Eater LA's opening report described a menu of pizza, burgers, pasta, beer and cocktails.

Martin took over the building at 3200 Airport Ave. in 2022. It took more than three years to open Matilda's there, which is named after his daughter. Founding baker François Pied was born in France and spent his earlier career making social media campaigns. He brought in lead baker Abel Pulsifer, who came from Brooklyn's Radio Bakery. The two met at Bub and Grandma's. Flour comes from Hayden Flour Mills, the dough ferments for at least 18 hours, and the croissants take four days. The menu includes a butter tasting of eight varieties. One is Paysan Breton made with hand-harvested Guérande salt, and another is Échiré from the Loire Valley. Coffee and matcha come from Caffè Luxxe. The dining room covers 1,800 square feet, and a 1,000-square-foot terrace opens it to the outdoors. Matilda's is open Wednesday through Sunday, 7 a.m. to 3 p.m.

Stiletto opened on October 21 in the same building. It is named after the Douglas X-3 Stiletto jet on display at the neighboring airport museum. Chef Patrick Powell was born in Ireland and has cooked at Chiltern Firehouse and One Club Row in London. His kitchen cooks over live fire and builds the menu around local produce. Powell told Eater LA:

"The term we're using is modern steakhouse, but sometimes I think it's almost underselling it, calling it a steakhouse."

Dinner starts with a Matilda's baguette and butter. The Infatuation lists loosely British dishes such as savoury mince on toast, peri peri chicken and a prime rib roast dinner, plus sticky toffee pudding and a three-martini flight. With the bakery supplying bread to the dining room, Martin's buildings now cover breakfast through dinner on one block.

What the Draft Plan Assigns to This Street

The airport is still scheduled to stop operating at midnight on December 31, 2028. The City of Santa Monica reaffirmed that date in a September 2025 statement that cites the federal consent decree. The land runs between Bundy Drive and 23rd Street. Urbanize LA reports that under Measure LC, which voters adopted in 2014, the land is limited to recreation and public open space. According to the city's conversion project site, the City Council directed on July 8, 2025, that the plan leave out any use that would require a public vote under Measure LC.

The design firm Sasaki drew the Draft Illustrative Master Plan. Urbanize LA's summary divides the site into four parts. Along Airport Avenue, the proposed uses match what already operates there.

Zone What the draft proposes What's there today
West side Dog park, flex lawn, 1.5-acre wildflower meadow, arboretum, water features, nature education center, connecting to Clover Park Existing Clover Park off Ocean Park Boulevard
East side Multipurpose fields, baseball diamonds, climbing wall, basketball courts, recreation center Existing Airport Park at Bundy and Airport Avenue
North side Existing structures kept and converted into roughly 500,000 square feet of leasable space Offices, studios and other campus buildings
South side, along Airport Avenue Food, performance and cultural events The Cloverfield, Matilda's, Stiletto, Barker Hangar, Studios 3026, the Museum of Flying, a twice-monthly antique market

On the west and east sides, the draft would add new parkland next to two existing parks. Along Airport Avenue it describes uses that are already in place. The city's own airport profile lists art studios, event venues, a restaurant, a theater and an interim public-access space used for the antique markets on the campus today. In this zone, the draft mostly describes the street as it already works.

The schedule is long. Environmental review is expected to run from spring 2027 through summer 2028. Detailed design would continue through 2029 and into the early 2030s, and construction depends on funding. For years before any meadow is planted, the street with the most to do will be Airport Avenue.

The Rest of the Avenue

The other businesses on the street explain why the plan puts culture here.

Museum of Flying. Visit Santa Monica describes the museum's heavy emphasis on Douglas Aircraft and the history of Santa Monica Airport. It is open Thursday through Sunday, 10 a.m. to 5 p.m. It houses the X-3 Stiletto, the jet that gave the new restaurant its name.

Studios 3026 / Airport Arts Center. This artist and gallery campus at 3026 Airport Ave. lists gallery hours of Thursday through Sunday, noon to 5 p.m. Its May 2026 newsletter describes the studios as open and hosting public events.

Barker Hangar. This event venue at 3021 Airport Ave. hosted EEEEEATSCON on May 16 and 17 this year, according to Santa Monica Sun.

Santa Monica Airport Antique Market. The market sets up between 2800 and 3200 Airport Ave. on the first and fourth Sunday of each month and never on a fifth Sunday. Rain or shine, the market's own schedule lists 7 a.m. to 3 p.m., $5 admission, free on-site parking, free entry for children and leashed pets welcome. Some listings, including Visit Santa Monica's October 4 entry, give an 8 a.m. start. The next market dates are November 22, December 6 and December 27.

Bread, aircraft, studios, a hangar and a flea market sit along one road. That mix of food, performance and culture is what the draft plan assigns to this edge.

A Fourth Sunday on Airport Avenue

The November 1 market has already passed, so November 22 is the next Sunday this month when every daytime stop on the street is open. The antique market runs that morning, and the museum, galleries and bakery all keep Sunday hours.

  1. Early. Arrive at the antique market as it opens, while parking is still easy to find.
  2. Mid-morning. Walk to Matilda's at 3200 Airport Ave. Lines have been long since opening, and the bakery closes at 3 p.m.
  3. Late morning. The Museum of Flying opens at 10 a.m. Seeing the X-3 Stiletto there makes the restaurant's name make sense.
  4. Afternoon. The galleries at Studios 3026 open at noon.
  5. Evening. Finish at Stiletto or The Cloverfield. Since Stiletto is only a month old, confirm its hours and reservations directly before you go.

Where the Plan Goes Next

The city held a community event on October 17 to present the draft. It said board and commission meetings and an online survey would follow. The Santa Monica Airport Conversion Project site lists the second round of commission reviews as tentative, with times to be confirmed closer to each date:

  • Commission on Sustainability, Environmental Justice, and the Environment, November 16
  • Planning Commission, November 18
  • Recreation & Parks Commission, November 19
  • Airport Commission, November 23

The Phase 4 survey is open on the same site in English and Spanish. The project timeline lists a "Vision Book" as Phase 5 for winter 2026. The Airport Commission meets on November 23, the day after the fourth-Sunday market.

When the Sasaki plan reaches environmental review in spring 2027, the Airport Avenue edge will already have a bakery, a steakhouse, a restaurant, a hangar, a gallery campus, a museum and a flea market.

At The Kostrey + Eckert Collection, we follow how plans like the airport conversion change the Sunset Park, Ocean Park and Mar Vista blocks around them. If you'd like to talk about how this changing edge of Santa Monica relates to a home you own or are considering, request a personalized home valuation or consultation.

Work With Us

We are expert negotiators and fierce client advocates with Zillow profiles full of glowing reviews. We are passionate about our home town of Los Angeles and have deep roots in our neighborhoods and communities. And we have a long, successful history in the constantly fluctuating real estate industry here. We would be honored to help you achieve your real estate goals.

Follow Us on Instagram