The story goes that Walt Disney used to bring his daughters to the Griffith Park merry-go-round, sit on a bench and imagine a place where adults and children could be entertained together. Disney and his company have told that story for decades, and a bench and one of the carousel's original horses now sit on Main Street, U.S.A. at Disneyland, the Los Angeles Times reported in October.
The carousel turned 100 this year, and on most days it sits behind a locked gate. It isn't the only one of the park's classic family rides that's waiting on the city. The former pony ride site has been empty since 2022. The city's 2026 attempt to find an operator for that site, two miniature train ride locations and a food and beverage stand was canceled in July. The carousel, the ponies and the little trains are all open city decisions at the same moment. Over the next two years the city will decide what these rides become, and the carousel is the only piece that already has a plan, a volunteer crew and a way for neighbors to pay for it.
A 1926 Machine With One Speed
The carousel sits a short walk from the Griffith Park Ranger Station, near the tennis courts and close to what's left of the park's original zoo. It was built in 1926 by the Spillman Engineering Co., a maker known for horses with wind-blown manes and heavily carved "romance" sides, and it also carries horses by the master carvers Charles Looff and Charles Carmel. The Spreckels family commissioned it for the Mission Beach Amusement Center in San Diego, now Belmont Park, and it moved to Griffith Park in 1937, according to The Eastsider.
It closed in March 2020, reopened in May 2021 and shut again in May 2022, both for repairs and because its ownership was uncertain. That account comes from the Recreation and Parks board report dated August 21, 2025, which recommended buying the carousel from The R&J Amusement Company LLC. The city completed the purchase for $1 million, and the carousel is now a public asset.
Owning it is the easy part. Each of the 66 wooden horses wears jewels and a tail of real horsehair, and squirrels and other animals have eaten many of the tails. The 1920s paint contains lead, and it has to come off before the small fractures in the wood joints can be repaired. The machine runs at a single speed, 14 mph, so the plan includes modern controls for a smoother ride and work to meet the Americans With Disabilities Act.
Tracy James of the Department of Recreation and Parks is leading the effort. Her volunteers include Kurt Sawitskas of Walt Disney Imagineering and two co-workers, Troy Leverton and Pim Renting, who both work in ride engineering. They're giving their own time, and they aren't representing the Walt Disney Co.
"Honestly, I don't think carousels were ever intended to last 100 years," Sawitskas told the Los Angeles Times. "And now here we are with a carousel that's 100 years old. We want to honor it and make it run again."
The Price Tag, and Who Pays It
Restoration estimates reported in October range from more than $3 million to $5 million, which is three to five times what the city paid for the carousel. James told ABC7 that the city will need to raise public funds to get the work done, and the city's stated goal is to have the carousel restored and running by the LA28 Olympics.
The money goes through the nonprofit Friends of Griffith Park. Its campaign page says donations will help rebuild the entire mechanism and restore all 66 horses. James is opening the carousel on as many Saturdays as she can and posts updates on the Griffith Merry-Go-Round Project Instagram. The Eastsider's preview of the October 31 open house described what one looks like: organ music from 11 a.m. to 1 p.m., city staff explaining the restoration plan, and no rides.
The Pony Site and the Trains Share One Contract
The other two rides are moving through a different city process. The Griffith Park Pony Rides ran for about 75 years under a city concessionaire. That contract expired in December 2022, and Recreation and Parks chose not to extend it. The department then hired the consulting firm PlaceWorks to lead a public process on what should replace the rides. The board's stated priorities include keeping the site youth- and family-oriented.
On January 30, 2026, the department released the Griffith Park Gateway Concessions request for proposals. It sought an operator to redevelop, manage and run the former pony ride site, two miniature train ride locations and one food and beverage facility. The department extended the deadline but still received only a limited number of proposals. On July 10 it canceled the solicitation without an award and said it plans to reissue it with more background information. The reissued version will be posted on the department's concession opportunities page.
So whoever wins the next round will shape the pony site and the train ride locations together, and the carousel's restoration timeline runs alongside it. All three rides are now on a city schedule.
| Ride | Who controls it now | Where it stands this fall |
|---|---|---|
| Griffith Park Merry-Go-Round, 1926 | City of Los Angeles, bought for $1 million | Closed to riders; Saturday open houses; restoration fundraising through Friends of Griffith Park |
| Former Pony Ride site | Recreation and Parks | Empty since the concession ended in December 2022; part of the Gateway Concessions RFP that is being reissued |
| Miniature train rides | Recreation and Parks concession | Trains running; two train ride locations included in the Gateway Concessions RFP |
What Runs in the Park Through the Holidays
For now, the trains are the rides that still carry passengers. The operator runs the Griffith Park & Southern Railroad at 4400 Crystal Springs Drive, with a mile of track, and a separate train at Travel Town, 5200 Zoo Drive, that circles the museum. Posted fares are $4 for adults and $3 for children 17 and under, $3 for seniors over 60, and $5 for the T-6 simulator. From November through mid-January the operator runs a shorter-hours schedule, so check its hours page before you go.
Here's the rest of the park's calendar from now into January:
- Saturday, November 14. Griffith Observatory, 2800 East Observatory Road, holds a Sunset Walk & Talk from 3:30 to 6 p.m. and a public star party from 2 to 9:45 p.m.
- Friday, November 20. L.A. Zoo Lights opens with new light displays and an artificial skating rink, and it runs through January 10.
- Thanksgiving, November 26. The Observatory and Zoo Lights are both closed. Zoo Lights is also dark on November 30 and December 1, 7, 14, 15, 16, 24, 25 and 31, and on January 4 through 7.
- Tuesday, December 8. The Zoo holds a Sensory-Inclusive night at Zoo Lights, followed by Pride Night on December 17.
- Saturday, December 12. Travel Town Museum, 5200 Zoo Drive, offers docent tours of its Pullman sleeping cars and Santa Fe motorcar from 10:30 a.m. to 3 p.m. Museum admission is free, and the museum is open Tuesday through Sunday, 10 a.m. to 5 p.m.
- December 19 and 21. The Observatory holds a public star party on Saturday, December 19, and a Sunset Walk & Talk on Monday, December 21.
- December 24 and 31. The Observatory keeps shortened hours, noon to 5 p.m., and it closes on Christmas Day.
If the carousel reopens on the city's schedule, it will sit beside a pony site and train concession whose operator hasn't been chosen yet. James has called it "the jewel in the middle of the city," according to the Los Angeles Times. For now, you can see it on the Saturdays she opens it, with the organ playing and the horses standing still.
At The Kostrey + Eckert Collection, we follow the Los Feliz edge of Griffith Park as closely as the streets around it, from the carousel's fundraising to the reissued concession contract. If you'd like a personalized home valuation or a consultation that accounts for what's changing this close to the park, we'd be glad to talk.